Skip to main content

Clear Path · GP migration

Leaving My Surgery Website?

Clear Path moves you to a site you own — without turning it into a redesign project.

For Berkshire and Thames Valley practice managers who need to stay online, meet accessibility standards, and keep control of their domain.

  • Free website audit
  • Reserve by 31 October 2026
  • Reading-based studio

Why this page exists

A clear route from your current MSW website.

My Surgery Website (MSW / FPM) is shutting down. Public notices point to pressure on domain instructions around September 2026 and hosting ending 31 March 2027 — check your own MSW letter for your exact dates.

If you’re a practice manager in Berkshire or the Thames Valley, you need a clear quote, a migration checklist, and a go-live date that won’t leave reception under pressure.

What Clear Path is

A time-boxed migration — not a six-month brand project.

We move your content, sort the domain, and get you live on a modern site you own. Built for WCAG 2.2 AA. No WordPress page-builder stack. Founder-led: you brief the person who builds.

Who it is for

  • Practice managers leaving MSW who want custom ownership and accessibility designed in
  • Practices that care about year-one clarity and who updates the site after launch

Who it isn’t for

  • If you only need a low-cost managed template, that may be the better fit. I can help you compare the options.

Packages

Two ways to move.

Published prices. Reserve by 31 October 2026. Capacity is capped, so the quote includes a go-live date you can plan around.

  • Move Essentials

    A time-boxed move, done properly

    £999

    + £29/mo on a 5-year term

    or £49/mo on a 1-year term

    We move your content, sort the domain, and get you live on a modern site you own, hosted and backed up.

    The build

    • Content moved from your current MSW site
    • Domain sorted, on a site you own
    • Your eConsult, Accurx or Patchs forms, the NHS App and NHS.uk health information linked prominently
    • Built for WCAG 2.2 AA
    • No WordPress page-builder stack
    • Founder-led: you brief the person who builds

    Every month

    • Hosted on Vercel (ISO 27001 certified, SOC 2 Type 2), with SSL
    • 99.9% uptime target, daily backups and monitoring
    • Same-week response on support requests
    • You make your own content changes, as trained
  • Move Standard

    Premium custom

    Custom build plus ongoing care

    £1,499

    + £29/mo on a 5-year term

    or £49/mo on a 1-year term

    A custom website migration with ongoing hosting and support.

    The build

    • Everything in the Move Essentials build
    • Custom design, not a managed template
    • Appointments and prescriptions still easy to find
    • Handover: who updates what, hosting path, support

    Every month

    • Hosted on Vercel (ISO 27001 certified, SOC 2 Type 2), with SSL
    • 99.9% uptime target, daily backups and monitoring
    • Security updates applied for you
    • Content changes made for you, up to 2 hours a month
    • Same-week response on support requests

Reserve by 31 October 2026. Not sure which fits? Start with the free audit and say you’re leaving MSW — we’ll map the move.

Book a call

How the move works

Four steps to a site you own.

  1. 01

    Free audit

    We review your current MSW site and flag what has to move.

  2. 02

    Clear quote

    Essentials or Standard, timeline, and what you own — in writing.

  3. 03

    Migration

    Domain, content, appointments and prescriptions still easy to find, then go-live.

  4. 04

    Handover

    Who updates what, the hosting path, and how support works after launch.

Capacity is capped (about 2–3 builds/mo) so delivery stays honest. Explore the live GP sample, read the accessibility statement and ask for an audit of your current site.

Dates

The dates that matter.

These dates cover the website move only. Check the dates in your own provider letter before planning the move.

  1. Domain pressure

    1 September 2026

    Domain and support pressure often around this date if MSW administers your domain — confirm in your letter.

  2. MSW hosting ends

    31 March 2027

    Public notices point to hosting ending on this date. Check your own MSW letter for your exact dates.

  3. Reserve by

    31 October 2026

    Clear Path places are reserved by this date so go-live is not left to the last months of hosting.

Proof

Click around Willowbrook Surgery before you talk to anyone.

A live GP demo, the accessibility statement, and published packages. Book your free audit — say you’re leaving MSW and we’ll map the move.

A live, hosted sample. The organisation shown is fictional.

Geography

Berkshire and the Thames Valley.

Berkshire / Thames Valley (RG / SL / OX / HP + wider Thames Valley ICB). Outside? Ask — we’ll say if capacity fits.

Start here

Book a free audit — say you’re leaving MSW.

We'll map the move from your current site: what has to come across, which package fits, and a go-live date that won't leave reception under pressure.

Paste your address for an instant, free report on accessibility, speed, search and more. No sign-up needed.

Or talk it through:Book a 15-minute callanoop@flutterly.co.ukA reply within one working day.